Indiana ChristmasEve Project

Project Overview

Capacity: 19.2MW/46.9MWh
Composition: 24 40-foot containers
Location: Indiana, USA
Application scenario: Grid-side peak load regulation
Construction time: 2021
Site: Two sites, each with an average of 0.8-1.2 cycles per day
 
 
Project Value:
Industry first: the world's first commercial 20-foot energy storage cabinet, the world's first 20-foot full-load transportation project, setting a precedent in the industry.
Minimal cost: the world's first 20-foot cabinet mode, the overall floor space is the same as the 40-foot cabinet, the on-site installation cost is reduced by 75%, and the transportation cost is reduced by 50%.
Fast delivery: 20-foot standard container, through the ocean express ship, shipped to the United States in 14 days, 40% faster delivery time, creating a record for energy storage delivery.
 